Trucks & trailers
Semi-trailer trucks, drawbar combinations, trailers, swap bodies
Make room for more trucks, buses and trailers on the site you already own. TRUCKTOWER adds parking levels above your yard, without buying more land or sealing extra ground.
From tractor units to articulated buses, Tower and Stack are designed around your fleet. Each space is tailored to vehicle dimensions and weight.
Semi-trailer trucks, drawbar combinations, trailers, swap bodies
Have a different vehicle? Share its dimensions and axle loads. We can assess a suitable parking solution.
Park without the hassle of shunting. The driver hands over the vehicle at ground level; the system parks it automatically on another level. When needed, the vehicle returns for collection. No internal ramps or driving aisles.
When your yard is full, growing sideways gets costly. Our solution adds parking above your existing site, not on another plot.
The yard is full. More capacity means buying another plot, building again and accepting transfer runs between the sites.
Every additional level multiplies the parking spaces, without a single square metre of extra land and without additional sealed ground.
Schematic view. We plan the number of levels, the vehicle types and the cycle times for each project, based on your site and your operations.
Both stack commercial vehicles, both are available for trucks and for buses. The difference lies in the lifting technology, and that decides everything else. You will find the same five points on both system pages.
Enclosed and automated: Tower creates protected parking levels and room for additional services.
Open and space-efficient: Stack adds parking levels to an existing working yard.
The site
For sites that need a lot of capacity for the long run.
For tight yards. A few metres next to the loading dock are enough.
The existing yard
The full solution: a new building with all services under one roof.
Built along the edge of the working yard, operations carry on.
The approval
Planned as a full building, built to last for decades.
No enclosed volume, so the procedure stays lean and is often the fastest route.
The budget
One project, full capacity from day one.
Starts at twelve spaces and grows column by column.
The services
Workshop, wash bay, weighbridge and rail loading can move in with it.
Focused on the essentials: parking and charging.
Five starting points, five routes. Each page states the problem in the words of the industry and says what changes in practice.
The switch to electric buses costs parking area and the fleet keeps growing.
The yard is full and the second site costs transfer runs every day.
In front of the loading doors a queue waits for its slot.
At night there is not enough room, and expanding means land outside the built-up area.
Businesses should stay and grow, but there is no new commercial land.
New build, parking deck, high-bay warehouse, stacking frames: the alternatives side by side.
Planned Tower and Stack designs for truck yards and depots.
Every Tower and every Stack is a node. Together they form a network of secure parking spaces and transfer points along the European corridors: connection points for autonomous long-haul transport.
Share your site plan and fleet. We will assess how much extra parking your site might accommodate.
Phone +49 7251 9760 620
Email [email protected]